What each one does best
A contractor is best at judgment and responsibility. That covers the big design choices and talks with the factory about what it can build (DFM, or design for manufacturing). It also covers first power-on and debugging at a workbench, supplier relationships and help with certification. Certification is the official testing a product needs before it can be sold. A contractor who has shipped products recognizes failure patterns from past work, and no checking tool holds that experience. When something goes wrong, there is a person to call.
MICA aims at drafting. A circuit board is the flat board inside a device that holds and connects the electronic parts. From a brief, MICA tries to produce a routed board with the copper paths drawn. If it passes a DRC (design rule check), you get factory files and a case file with no connector openings yet. Simple boards can pass, and many still fail. Firmware (the software on the chip) is a host-only placeholder. MICA runs its checks the same way each time and writes down the results.
Where they differ
Each row gives the contractor first, then MICA.
Cost. A contractor charges for their time; ask for a quote. MICA cannot be bought today. Its planned plans are Free, and Pro at $19 per month, both with the AI models included.
Speed to a first version. A contractor has a queue and needs time. MICA runs on your machine, and the attempt may fail.
Judgment. A contractor offers real judgment on the overall design, its trade-offs and problems seen before. MICA offers none: it drafts and checks, and you decide.
Lab work. A contractor does first power-on, debugging and measurement. MICA does none of that. Its checks run in software only, and zero boards have been fabricated.
Responsibility. A contractor is a person who owns the outcome. MICA gives you reports of the checks.
Cost of changes. With a contractor, every version costs more paid time. With MICA, you refine in plain language, and saved versions can be compared with each other.
Availability. A contractor is booked in advance, with an agreed job and a contract. MICA is not available yet; there is a waitlist.
Best for. A contractor suits anything you need to work. MICA is for trying simple boards and reviewing the draft yourself.
Who should pick which one
Hire the contractor when the design is new, touches safety or is heading for certification. Hire one when you need first power-on at a workbench and a person who answers for the result. Hire one when being wrong would cost more than the engineer does. This is most of what makes hardware hard, and it is fair to say so.
Consider MICA later for a first draft of a simple board that you will review yourself. It is pre-release, so join the waitlist. A contractor could review a draft and its reports, but MICA has not yet produced a board that was built, so do not count on saved time.
Spend a contractor's hours on judgment. If a draft tool ever saves them time on a first layout, good, but that has not been proven yet.
Product and company names mentioned on this page are trademarks of their respective owners. Mica is an independent product and is not affiliated with, endorsed by or sponsored by any of them. Competitor features and prices are approximate, reflect what we understood when this page was last reviewed, and may have changed. Check them with the vendor before you decide.