Mica
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Developers Coming soonEnterprise Coming soon
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Pricing
Talk to usJoin the waitlist
Product
DesktopProducts overviewAI hardware engineerAI PCB designerAsk MicaDownload
Resources
DocsTutorialsUse casesCompareGlossaryFAQSecurityTransparencyUpdates
Developers Coming soonEnterprise Coming soon
PricingNewsTalk to us
Join the waitlist
Mica

Windows alpha. Designs stay on your computer.

Product

  • Desktop
  • Products
  • Download
  • Pricing
  • Updates

Capabilities

  • AI hardware engineer
  • AI PCB designer
  • Ask Mica
  • MCP
  • Integrations

Use cases

  • What you can build
  • Wearables
  • Connected sensors
  • Motor control
  • All use cases

Resources

  • Docs
  • Tutorials
  • Compare
  • Glossary
  • FAQ

Company

  • Security
  • Transparency
  • Careers
  • Events
  • Contact
  • Explore
  • Developers Coming soon
  • Enterprise Coming soon

Programs

  • Startups
  • Students
  • Nonprofits

Legal

  • Terms of Service
  • Privacy Policy
  • Cookie Policy
  • EULA
  • Usage Policy
  • Responsible Disclosure
  • Policies
© 2026 Mica. Mica by MuscoLabsDrafts of legal terms are pending lawyer review.
Home/Glossary/BOM: bill of materials
Glossary

BOM: bill of materials

BOM stands for bill of materials: the list of parts to buy and solder (join with melted metal) onto the board. It says what each part is electrically, what it is physically, what to order, and how many. Your assembler (the company that solders the parts on) quotes from it, and your buyer orders from it, so read it with both jobs in mind.

What each line tells you

Each line answers five questions. Which one: the reference designator, such as R7, C12 or U3, which ties the part back to the schematic (the drawing of what connects to what). What value: 100nF, 10%, 50V, X7R (a ceramic grade). What package: the footprint (the copper shape and holes the part needs), such as 0603 (a tiny chip part size) or QFN-48 (a flat package with pads underneath). It must match the pads on the board. What to order: the manufacturer part number (MPN) and the manufacturer, the only unambiguous identifier. How many: the quantity plus assembly spares.

The columns people skip

DNP (do-not-populate) flags parts that are on the layout (the physical arrangement of copper and parts) but stay off the board. Without the flag you pay for parts you did not want. Alternates list approved backup suppliers, and a BOM without alternates is a project on hold during the next shortage. Lifecycle status (active, not recommended for new designs, or end of life) tells you whether you are designing in a time bomb. Sort by MPN for purchasing: ten identical 100nF lines are one purchase order.

What MICA exports

BOM as a versioned artifact

A MICA build that passes exports a BOM with designators tied to footprints and trust labels on each part. Every build is saved as a fixed version, so you can compare versions and see the BOM difference. Stock and price are indicative estimates, not live distributor data. Factory (fab) ordering is not built. The full reading guide is in the BOM tutorial.

Scrubbing the BOM before you commit

A BOM is a hypothesis until someone validates it. Scrub it before the layout freezes. Check every MPN against a distributor for stock and lead time. Flag anything not recommended for new designs or at end of life. Confirm the package in the MPN matches the footprint on the board: a -TR or -CT suffix changes nothing electrically, while a package-code difference changes everything. Verify that alternates are genuinely form-fit-function equivalents (same shape, same fit, same electrical behavior), not merely another 100nF part. The most expensive BOM error is discovering the unobtainable part after the boards arrive. Scrub early, scrub again before ordering, and keep the scrubbed revision under version control with the Gerbers (the files a factory uses to make the board) it belongs to.

See also

  • Glossary: pick and place (the machine that puts parts on the board)
  • Glossary: footprint
  • Tutorial: how to read a BOM

Start with a description.

Mica is in early development. Join the list and we will tell you when it is ready to try.

By joining, you agree to our Privacy Policy. We will only email you about Mica’s launch, and you can ask to be removed at any time.

We will email you when there is something to try. No spam.