What MICA does for a farm sensor system
A system of several boards is beyond the normal build today. Designs with several boards exist in the engine, but the normal build does not produce them from a brief yet. So a brief such as “ten soil nodes reporting hourly to a solar gateway with cellular uplink” is not something MICA can deliver. Work on one board at a time. Cellular uplink means the gateway sends data over the mobile phone network. MICA has power budget and radio link budget calculators, but the normal build does not run them yet, so that math is still yours to do.
MICA turns your brief into requirements, parts, a schematic (the map of which parts connect to which) and a netlist (the list of connections), then tries to place and route the board. The electrical rule check (ERC) tests the wiring before and after routing (drawing the copper paths). The design rule check (DRC) tests clearances, the copper ring around each hole, and any connection left unrouted. A board that fails is shown as failed and is not exported. Firmware (the software on the chip) is a placeholder today. It compiles and passes tests on your computer against a simulated register map, and it must not be flashed to a chip. The case comes as STEP and 3MF (3D file formats), sized to the board, with no connector openings yet.
- Nodes and gateway: one board at a time for now
- Energy math: yours to do for now
- Radio hops: range and link math are not in the normal build yet
- Factory files: if a board passes, Gerber, drill, pick-and-place, BOM (bill of materials: the parts list) and KiCad exports
The system keeps changing
Farm hardware keeps changing: new sensors, new radios, new cases. You can ask for a change in plain words. MICA tries again and re-runs the checks, and the new attempt can fail. Each revision keeps a snapshot, so you can compare versions, including parts list changes. Design Q&A (questions and answers about the design) points to the decisions file for the reason behind each choice.
The ERC is the electrical rule check, a test that the wiring makes sense. It runs when the schematic is drawn and after routing. A failing board is a normal outcome, and MICA says which check failed.
Honest limits
No MICA board has been fabricated yet. Season-long reliability, weather sealing and field range are unproven. Cellular certification and carrier requirements are your responsibility. Firmware is a host-only placeholder and must not be flashed to a chip.